Toddington Signal Box
Home > GWR Signalling > GWR Signal Boxes > Toddington
View Signal Diagram.
The Box
Views from the Box
The Lever Frame
Diagrams
Tyer's Electric Key Token Machine
Instruments
SW Board
Up Main Distant (Fixed)
Up Main Home - No 2
25 MPH Board
No 1 Running Disc
South Ground Frame (No 7)
Up Main Inner Homes - No 3/5/8/9
Discs 15A/10
Down Advanced Starting - No 24
Down Starting - No 25
Lever Leads
|
1 ---- DISC AT YARD POINTS ---- 11 |
2 ---- UP MAIN HOME ---- 11 1 |
3 ---- UP MAIN INNER HOME ---- 11 20 |
4 ---- UP MAIN TO NORTH HEAD SHUNT STARTING ---- 20 |
5 ---- UP MAIN TO UP LOOP INNER HOME ---- 12 11 |
6 ---- UP LOOP TO NORTH HEAD SHUNT STARTING |
7 ---- INTERLOCKING LEVER FOR YARD G.F. |
8 ---- UP MAIN CALLING ON ---- 11 |
|
21 ---- SWITCH LEVER ---- NOTCH 3 ---- PUT BACK NO 11 ---- NOTCH 4 ---- 11 1 2 3 15 24 25 26 |
9 ---- UP MAIN TO UP LOOP CALLING ON ---- 12 11 |
10 ---- DISC FOR NO 14 ---- 12 14 |
11 ---- F.P.L. FOR NO 12 ---- NIL OR ---- 12 |
12 ---- UP MAIN FACING ---- UP LOOP |
14 ---- FROM NO 1 SIDING TO PARLOUR ROAD ---- MAIN ---- 12 |
15 ---- DISCS TO AND FROM PARLOUR ROAD |
16 ---- DISC FOR NO 16 ---- 12 11 14 |
|
20 ---- MOTOR POINT |
22 ---- SIGNAL HEAD- SHUNT TO UP MAIN 11 20 |
23 ---- SIGNAL HEAD- SHUNT TO DOWN MAIN 12 |
24 ---- DOWN MAIN ADVANCED STARTING |
25 ---- DOWN MAIN STARTING |
26 ---- DOWN MAIN HOME ---- 11 |
28 ---- DOWN LOOP TO DOWN MAIN HOME ---- 12 |
All photographs by Danny Scroggins, 15/10/06.
Updated, 03/10/07.