Cheltenham Race Course Signal Box
Home > GWR Signalling > GWR Signal Boxes > Cheltenham Race Course
View signal diagram.
The Box
Signal Box Interior
|
|
|
|
|
|
| Lever frame. | Lever frame. |
Tyer's EKT instrument |
Internal telephone |
Box-to-box to Winch. |
Views from the Box
In the last couple of shots I couldn't take a photo of the train any closer because I had to go outside to get the token!
Cheltenham Race Course Level Crossing
2/4/9/10 Down Inner Homes (with racecourse in the background)
3 - Down Platform to Neck &
5 - Up Platform to Neck
19 - Neck to Down Platform Facing Power Points
22 Up Advanced Starting
23 Down Platform Starting
24 - Neck to Up Platform Starting (top arm) &
26 - Neck to Down Platform Starting (bottom arm)
(Slightly odd titles)
25 Up Platform Starting
Down Platform (North end)
|
|
|
|
|
|
GWR trespass notice. |
The modern equivalent! |
Platform garden. | Works access gate. |
Station building
Down Platform (South end)
Site of Up Platform (South end)
Out and about
|
|
|
|
|
| Rain on the hills! |
Point rodding compensator. |
Former ground frame. |
Inner Homes slot detectors |
5542 in the Up Platform
Lever Leads
|
1 ---- DOWN MAIN HOME ---- 11 ---- OR ---- 12 11 |
2 ---- DOWN MAIN INNER HOME ---- 11 |
3 ---- DOWN PLATFORM TO NECK STARTING |
4 ---- DOWN MAIN TO UP PLATFORM INNER HOME ---- 12 11 19 |
5 ---- UP PLATFORM TO NECK STARTING ---- 19 |
9 ---- DOWN MAIN CALLING ON ---- 11 |
10 ---- DOWN MAIN TO UP PLATFORM CALLING ON ---- 12 11 |
11 ---- F.P.L. FOR 12 ---- NIL ---- OR ---- 12 |
|
12 ---- DOWN MAIN FACING ---- FROM UP PLATFORM |
17 ---- SWITCHING LEVER ---- 11 22 25 |
19 ---- NECK TO DOWN PLATFORM FACING ---- FROM UP PLATFORM ---- (WORKED BY MOTOR) |
22 ---- UP MAIN ADVANCED STARTING |
23 ---- UP PLATFORM STARTING ---- 12 |
24 ---- NECK TO UP PLATFORM STARTING ---- 12 19 |
25 ---- DOWN PLATFORM STARTING |
26 ---- NECK TO DOWN PLATFORM STARTING |
All photographs by Danny Scroggins, on offical duty, 24/06/07.