BROADWAY SIGNAL BOX

Home

History
Removal Journal Restoration Journal
Photographs
Videos
Press Cuttings
Preservation Society
GWSR Signalling
Future Plans


Copyright 2007
© Danny Scroggins & Luke Cartey

GWR Signalling


Home > GWR Signalling > Block System

Signal Boxes | Route Map | Block System | Telecoms

There are a number of token and staff sections in operation on the railway. A chart might be useful.

Previous arrangement (Until Feb 2007)
Broadway Toddington Winchcombe Gotherington Chelt'ham RC
Line
under
construction.
Electric Token Block
(Red with
blue border
)
Config. B.
One train staff
(Yellow)

Long section staff
(Brown).



Arrangement March 2007 - 26th Oct 07.
Broadway Toddington Winchcombe Gotherington Chelt'ham RC
Line
under
construction.
Electric Token Block
(Blue)
Config. B.
Electric Token Block
(Yellow) Config. C.
OR One train staff
(Yellow)

Long section staff
(Brown).



Current Arrangement (From 27th October 2007).
Broadway Toddington Winchcombe Gotherington Chelt'ham RC
Line
under
construction.
Electric Token Block
(Blue)
Config. B.
Electric Token Block
(Green) Config. C.
OR One train staff
(Yellow)

Long section staff
(Brown).



Arrangement with Cheltenham Race Course and Gotherington Signal Boxes commissioned.
Broadway Toddington Winchcombe Gotherington Chelt'ham RC
Line
under
construction.
Electric Token Block
(Blue)
Config. B.
Electric Token Block
(Green) Config. C.
OR One train staff
(Yellow)

Electric Token Block


Electric Token Block


Long section staff
(Brown).



Arrangement with Cheltenham Race Course, Gotherington and Broadway Signal Boxes commissioned (proposed).
Broadway Toddington Winchcombe Gotherington Chelt'ham RC
Acceptance Lever. Electric Token Block
(Blue)
Config. B.
Electric Token Block
(Green) Config. C.
OR One train staff
(Yellow)

Electric Token Block


Electric Token Block


Long section staff
(Brown).



Thanks to Ian Smith for feedback on this page.